Driveway questions
Do I need planning permission for a new driveway?
Usually not, as long as the surface is porous or the water drains onto your own garden. Paving over five square metres of front garden with a non-porous surface that drains to the road does need permission. Conservation areas and listed buildings can add extra controls. See our parking rules guide.
Which surface lasts longest?
All of them last well if the sub-base is right. Block paving is easiest to repair. Imprinted concrete and tarmac are tough but harder to patch invisibly. Resin depends heavily on the base beneath it.
Can you lay resin over my old drive?
Sometimes. If the existing tarmac or concrete is sound, level and able to drain, it may be suitable. Cracked, sunken or soft areas mean it needs replacing first.
How long does a driveway take?
It depends on the size, the surface and the weather. A typical front driveway takes several days from digging out to finishing. Resin and concrete also need dry weather to cure.
Will the work block my access?
For a while, yes. We'll let you know when the drive will be out of use so you can park elsewhere, and we keep the footpath safe and clear while we work.
Do you need to come and look?
We need to understand levels, drainage, access and the size of the area before we can give an accurate quote.
Can you help with a dropped kerb?
Yes. We can help you prepare the council application and plan the drive so it meets the lowered kerb properly. See dropped kerbs.
Do you work outside Hartlepool?
We cover the town and nearby villages including Hart, Elwick, Greatham, Dalton Piercy and Wynyard. Ask if you're nearby.